(02) 4929 4109

mail@wdegroup.com.au

PO Box 23, Charlestown, NSW 2290

Let's Connect

Wallace Design Group Pty Ltd



Home

About Us

Design Services

Design Projects

Careers

Capability

Testimonials

Contact Us

ONE Apartments

ONE Apartments

Mixed-Use Development

Client: GWH Build

Development Value: $115 Million

Builder: GWH Build

Architect: Marchese Partners & CKDS Architecture

Design Services: Plumbing (Hydraulic), Fire, Waste & Water Infrastructure and Civil

Design Deliverables: Tender/Construction Design and Documentation, Services During Construction

1 National Park Street, Newcastle West

ONE Apartments

View 3D Flythough

Role included, but was not limited to the following

  • Visit site the site to ascertain onsite conditions, familiarise with site opportunities and constraints.
  • Obtain all relevant information from council and other authorities, including preparation and submission of applications.
  • Spatial planning and attendance at design meetings.
  • Preparation of Tender/Construction Design and Documentation, including plans, schematics and specifications.
  • Assistance with site RFI’s and queries, including QA inspections of works that have been installed.
  • Plumbing (Hydraulic) services included sewer drainage, trade waste drainage, stormwater drainage, sanitary plumbing, cold water (potable), cold water (unpotable), hot (warm) water (potable), fire hose reel, gas, downpipes and gutters.
  • Fire services included fire hydrants, fire sprinklers and fire drencher.
  • Waste & Water Infrastructure services included authority sewer and water mains
  • Civil services included stormwater drainage, erosion and sediment control, driveway & carparking, Section 138 Road and Footpath.

Challenges included, but were not limited to the following

  • Authority sewer and water main diversions, with a high attention to detail required to ensure no clashes with the proposed buildings structural foundations and other inground services.
  • Design and documentation the sanitary plumbing and stormwater plumbing to the podium level. This required detailed co-ordination with the Builder, Architect, and all other service consultants to ensure no clashes were encountered.
  • Design and documentation of the fire hydrant and fire sprinkler pump room and storage tanks. With the proposed location being on a mezzanine level below a structural transfer slab, this required detailed co-ordination using 3D (Revit).
ONE Apartments
ONE Apartments
ONE Apartments
ONE Apartments
ONE Apartments

Our Design Projects

Book A Consultation

Book A Consultation with Wallace Design Group today!